3.0 MW
Battery power, measured
Case Studies
Every project tells a different story. Our case studies show how businesses, installers, and energy professionals use FlexHub to unlock the full value of their energy assets. Explore real-world examples of smarter battery optimisation, flexible energy management, and measurable business results.
INDUSTRY
Logistics: main fleet & distribution hub, with large rooftop PV on site
SPECS
3.0 MW / 8.4 MWh battery, RESA connection, Belpex-indexed supply
RESULTS
€21,080 settled market revenue over the first 2 settled months (Apr–May 2026)
KEY RESULTS
FCR capacity as base income + PV self-consumption behind the meter
Battery power, measured
First settled month
Second settled month
Growth as steering ramped up

INDUSTRY
Manufacturing: continuous process load, PV metered on the same feed
SPECS
1.0 MW / 2.0 MWh battery, Fluvius connection, Belpex-indexed supply
RESULTS
€38,322 settled market revenue in H1 2026, the highest across all sites we steer
KEY RESULTS
aFRR capacity + activation, with intraday trading layered on top

Settled market revenue, H1 2026
Markets steered in parallel
Availability offered to the grid
Rank among the sites we steer
INDUSTRY
Events: consumption swings with build-up days and show days
SPECS
0.8 MW / 1.7 MWh battery, Fluvius connection, Belpex-indexed supply
RESULTS
€26,186 settled market revenue Jan–Jun 2026, June 71% above January
KEY RESULTS
Two frequency services stacked on one asset, re-weighted as markets move
Settled market revenue, Jan–Jun 2026
June versus January
Market services, one battery
Availability offered to the grid

INDUSTRY
Machinery manufacturing: two production sites, one owner
SPECS
2 × 0.65 MW / ~1.0 MWh batteries, RESA connections, day-ahead-indexed supply
RESULTS
€28,491 settled across both sites in H1 2026, identical batteries, 33% apart
KEY RESULTS
Frequency flexibility on both sites, settled per battery

MW — two identical assets
Site 1, settled H1 2026
Site 2, settled H1 2026
Gap between identical batteries — the load behind the meter decides
INDUSTRY
Retail: flat, predictable load with 280 kWp rooftop solar
SPECS
0.22 MW / 0.45 MWh battery, Fluvius connection, 1.28 cycles per day
RESULTS
€7,102 net in Q1 2026 against a modelled €5,897, 20% ahead of plan
KEY RESULTS
FCR capacity as base income + solar optimisation behind the meter
Capex
Net value, year 1
Q1 actual versus plan
Payback

Case Studies
Every project tells a different story. Our case studies show how businesses, installers, and energy professionals use FlexHub to unlock the full value of their energy assets. Explore real-world examples of smarter battery optimisation, flexible energy management, and measurable business results.

INDUSTRY
Manufacturing, with rooftop PV on site
SPECS
Manufacturing, with rooftop PV on site
RESULTS
€80,747 net value in year one, payback around 3.8 years
KEY RESULTS
0.65 MW / 1.2 MWh battery, Resa MT connection, PPA at €80/MWh
Capex
Net value, year 1
Net value, 10 years
Payback

INDUSTRY
Logistics
SPECS
3.0 MW / 12 MWh, Resa MT, ±0.5 cycles per day
RESULTS
FCR capacity as base income
KEY RESULTS
0.65 MW / 1.2 MWh battery, Resa MT connection, PPA at €80/MWh

Capex
Net value, year 1
Net value, 10 years
Payback
INDUSTRY
Manufacturing, with rooftop PV on site
SPECS
Manufacturing, with rooftop PV on site
RESULTS
€80,747 net value in year one, payback around 3.8 years
KEY RESULTS
0.65 MW / 1.2 MWh battery, Resa MT connection, PPA at €80/MWh
Capex
Net value, year 1
Net value, 10 years
Payback

INDUSTRY
Logistics
SPECS
3.0 MW / 12 MWh, Resa MT, ±0.5 cycles per day
RESULTS
FCR capacity as base income
KEY RESULTS
0.65 MW / 1.2 MWh battery, Resa MT connection, PPA at €80/MWh

Capex
Net value, year 1
Net value, 10 years
Payback