Five sites, settled figures

Five Belgian sites with a battery: sector, size, markets and what was settled. Client names are never published.

Logistics & distribution hub, Wallonia

INDUSTRY

Logistics: main fleet & distribution hub, with large rooftop PV on site

SPECS

3.0 MW / 8.4 MWh battery, RESA connection, Belpex-indexed supply

RESULTS

€21,080 settled market revenue over the first 2 settled months (Apr–May 2026)

KEY RESULTS

FCR capacity as base income + PV self-consumption behind the meter

3.0 MW

Battery power, measured

€6,281

First settled month

€14,799

Second settled month

×2.4

Growth in the second settled month

FlexHub consultant presenting at a whiteboard to colleagues in a bright meeting room

Industrial manufacturer, Flanders

INDUSTRY

Manufacturing: continuous process load, PV metered on the same feed

SPECS

1.0 MW / 2.0 MWh battery, Fluvius connection, Belpex-indexed supply

RESULTS

€38,322 settled market revenue in H1 2026, the highest across all sites we coordinate

KEY RESULTS

aFRR capacity + activation, with intraday trading layered on top

FlexHub team members in a meeting around a large table in a room with tall arched windows

€38,322

Settled market revenue, H1 2026

3

Markets in parallel

>99%

Availability offered to the grid

Exhibition & events venue, Antwerp

INDUSTRY

Events: consumption swings with build-up days and show days

SPECS

0.8 MW / 1.7 MWh battery, Fluvius connection, Belpex-indexed supply

RESULTS

€26,186 settled market revenue Jan–Jun 2026, June 71% above January

KEY RESULTS

Two frequency services stacked on one asset, re-weighted as markets move

€26,186

Settled market revenue, Jan–Jun 2026

+71%

June versus January

2

Market services, one battery

98%

Availability offered to the grid

Rocky river valley under a grey, overcast sky

Machinery manufacturer, Wallonia: two sites

INDUSTRY

Machinery manufacturing: two production sites, one owner

SPECS

2 × 0.65 MW, two identical assets

RESULTS

€28,491 settled across both sites in H1 2026, identical batteries, 33% apart

KEY RESULTS

Frequency flexibility on both sites, settled per battery

Two FlexHub colleagues reviewing work together on a laptop

2 × 0.65

MW — two identical assets

€16,253

Site 1, settled H1 2026

€12,238

Site 2, settled H1 2026

33%

Gap between identical batteries: the load behind the meter decides

Retail chain, single store, Greater Brussels

INDUSTRY

Retail: flat, predictable load with 280 kWp rooftop solar

SPECS

0.22 MW / 0.45 MWh battery, Fluvius connection, 1.28 cycles per day

RESULTS

€7,102 net in Q1 2026 against a modelled €5,897, 20% ahead of plan

KEY RESULTS

FCR capacity as base income + solar optimisation behind the meter

€112,500

Capex

€23,092

Net value, year 1

+20%

Q1 actual versus plan

≈4.9 yr

Payback

Waterfall dropping from a green plateau into a deep gorge